-
Prove Equation (2.26) solution
-
Given a set of periodic
tasks t1 t2 ... tm with repetition
periods T1 < T2 < ... < Tm and run times C1
C2 ...Cm . solution
(a) What is the deadline driven schedule
and when such a schedule is feasible?
(b) Given that T1= 1, T2
= 2.5, T3 = 6 and c1 = 0.5, c2
= 1.01, c3 =0.5, can these tasks be scheduled according to the rate
monotonic scheduling? solution
-
Consider a Real Time system
where three tasks , , and are competing for the processor. Assume that T1=
2, T3= 4, C1=C3= 1. Find the values of
T2 and C2 which maximize the processor utilization factor. Assume
rate monotonic scheduling and that T1 < T2
< T3. solution
|